Most fixture installation problems start before the trucks arrive: walls without blocking, power in the wrong place, no dock booking, or flooring that is not finished. This checklist covers what a brand, project manager or general contractor should confirm before store fixtures are delivered.
On a rollout, make this checklist a standard sign-off form that each store completes before the fixtures ship, so the same problems are caught before every opening. See retail rollout programs.
DNS labels and packs fixtures by store and area, supplies shop drawings and install documents, and coordinates with whoever is installing: our installation partners or your general contractor. We answer field questions and help close out deficiencies with the site team. See store fixture and millwork lead times.
Usually an experienced fixture installer, either the supplier’s installation partner or a crew arranged by the general contractor. Electrical connections go to a licensed electrician.
Blocking is solid wood or metal backing installed inside a wall so wall-hung fixtures have something strong to fasten into. It has to go in before the drywall is closed.
Note the damage on the delivery receipt, photograph it, and tell the supplier the same day so replacement parts can be scheduled before opening.